Low energy solutions for hospitals: Integrated heating and cooling system for hospitals with goal of mimimum netto energy usage
The aim in this project is to optimize energy usage for heating and cooling in hospital buildings by modeling the hydronic system, including thermal energy storage through a borehole thermal energy storage. NORCE's main responsibility is the modeling part, including a Python implementation in the tool VKBsim.
Project facts
Name
Low energy solutions for hospitals: Integrated heating and cooling system for hospitals with goal of mimimum netto energy usage
Status
CONCLUDED
Duration
01.04.17 - 31.12.20